Barrier Corp. installed a Siplast Lightweight Insulating Cellular Concrete Roof system on this new construction hospital project. Our scope of work included installation of the LWIC roof system on several roof levels over metal decking. Barrier Corp. poured a concrete slurry coat into the metal deck flutes and then installed the expanded polystyrene EPS insulation board in a stair step fashion to create a positive slope to drain pitch. Finally we poured a 2" average of LWIC topping over the EPS insulation board to provide a smooth and monolithic surface ready to be roofed.
- General Contractor: Pepper Construction Company
- Owner: Central DuPage Hospital
|